S 320TH ST over I-5

1.8 N JCT SR 18 · County 033, Washington · Built 1960 · 5 Lanes · 49,879 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 7 Good

Location

47.315114, -122.297211

This bridge is in worse condition than 83.7% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 66 years old.

Nearby Bridges

Bridge Details

Structure #
0006262A0000000
Year Built
1960
Length
101.2 m (332 ft)
Max Span
30.5 m
Width
23.2 m (76.1 ft)
Lanes
5
Daily Traffic
49,879
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,466,000
Total Project Cost
$12,931,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.