Longstreet Lane over Somerton Creek

0.80 TO 668 / 0.50 TO 667 · County 800, Virginia · Built 2024 · 2 Lanes · 227 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000031937
Year Built
2024
Length
56.4 m (185 ft)
Max Span
14.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
227
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$262,000,000
Total Project Cost
$393,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.