Mineral Springs Rd over Jones Swamp

0.50 TO 643 / 0.10 TO 653 · County 800, Virginia · Built 2020 · 2 Lanes · 570 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000031288
Year Built
2020
Length
27.7 m (90.9 ft)
Max Span
9.1 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
570
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$154,000,000
Total Project Cost
$231,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.