GEORGETOWN PIKE over CAPITAL BELTWAY

00.35FR1933/00.10TO686 · County 059, Virginia · Built 2024 · 5 Lanes · 8,341 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000031609
Year Built
2024
Length
89 m (292 ft)
Max Span
48.2 m
Width
32.2 m (105.6 ft)
Lanes
5
Daily Traffic
8,341
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$350,000,000
Total Project Cost
$376,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.