GEORGETOWN PIKE over SCOTTS RUN

00.03FR685/00.19TO6037 · County 059, Virginia · Built 1995 · 2 Lanes · 21,926 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000006473
Year Built
1995
Length
12.2 m (40 ft)
Max Span
11 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
21,926
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000,000
Total Project Cost
$400,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.