CAPITAL BELTWAY IL over RAMP EN OF DULLES TOLL R
00.58FR123/02.01TO193 · County 059, Virginia · Built 2024 · 5 Lanes · 75,423 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
38.929531, -77.211067
This bridge is in worse condition than 28.3% of bridges in County 059. The average bridge in Virginia is 0 years old; this one is 2 years old.
Nearby Bridges
RAMP DTSWN over RAMP DWN
Built 2012
495 NBH over 267 ramp DWN
Built 2012
JONES BRANCH NEW over RAMPS DWN & DTWHN
Built 2012
RAMP DTSWH over RAMP DSE & DTR; DAR
Built 2012
SBH 495 over RAMPS DTWSH & FUTURE
Built 2012
RAMP NBH over RAMP DSE
Built 2012
RAMP JB EWN over RAMP DSE
Built 2012
JONES BRANCH NEW over RAMP DSE
Built 2012
SBH 495 over RAMP DSE
Built 2012
NBL CAPT. BELTWAY over EBL DULL. TOLL & RAMP SE
Built 1961
Bridge Details
- Structure #
- 000000000031607
- Year Built
- 2024
- Length
- 31.3 m (102.7 ft)
- Max Span
- 30.7 m
- Width
- 23 m (75.5 ft)
- Lanes
- 5
- Daily Traffic
- 75,423
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $100,000,000
- Total Project Cost
- $120,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.