495 NBH over 267 ramp DWN

0.68 fr 7 1.82 to 193 · County 059, Virginia · Built 2012 · 2 Lanes · 10,259 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000029963
Year Built
2012
Length
57.3 m (188 ft)
Max Span
28.7 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
10,259
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$2,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.