MARTIN LUTHER KING over OTTERDAM SWAMP

7.74 Miles to Route 10 · County 181, Virginia · Built 2024 · 2 Lanes · 1,014 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000031000
Year Built
2024
Length
35.1 m (115.2 ft)
Max Span
17.3 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
1,014
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$499,000,000
Total Project Cost
$551,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.