Petersburg Road over Spring Branch Spillway

1.25 from 653/0.90 to 606 · County 183, Virginia · Built 1973 · 1 Lanes · 90 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000018318
Year Built
1973
Reconstructed
2015
Length
8.2 m (26.9 ft)
Max Span
8.2 m
Width
6 m (19.7 ft)
Lanes
1
Daily Traffic
90
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$131,000,000
Total Project Cost
$145,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.