RAMP E OF RTE. 1 over HUNTING CREEK
00.05FR1NB/00.05TOI-95NB · County 059, Virginia · Built 2002 · 1 Lanes · 7,708 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.792317, -77.053969
This bridge is in worse condition than 35.5% of bridges in County 059. The average bridge in Virginia is 0 years old; this one is 24 years old.
Nearby Bridges
RAMP RT1NB TO I-95 over 95N&S;1N&S;RMPC;M;N;G&C
Built 2007
RAMP F LOOP TO 1 N over HUNTING CREEK
Built 2006
RMP E(RTE1)TOI-95N over CAMERON RUN
Built 2005
RAMP F OF I-95NB over HUNTING CREEK & WETLANDS
Built 2005
RAMPC & C1 TO I-95 over 95SB;NB EX.RMP-K;L;C;F;I
Built 2006
RAMP I TO RTE.1 over CAMERON RUN
Built 2005
I 95 NB OUTER LOOP over SANITARY PLANT OUTFALL
Built 2008
RAMPJ:RTE1 TO 95SB over I-95S(EXPRESS;LOCAL)RMPK
Built 2008
RTE 1 J DAVIS HWY over RAMPG;F;I95N&S CAMERONRN
Built 2007
RAMPS C & J TO 95 over GRADE CROSSING__SEE TEXT
Built 2006
Bridge Details
- Structure #
- 000000000027083
- Year Built
- 2002
- Length
- 233.8 m (767.1 ft)
- Max Span
- 18.3 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 1
- Daily Traffic
- 7,708
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000,000
- Total Project Cost
- $2,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.