U.S. 58 Bypass over ROCKY BRANCH

0.7 FR. 903 0.3 T MAPLE L · County 117, Virginia · Built 1999 · 4 Lanes · 7,748 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000000026222
Year Built
1999
Length
7.2 m (23.6 ft)
Max Span
3.4 m
Lanes
4
Daily Traffic
7,748
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$327,000,000
Total Project Cost
$511,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.