U.S. 58 (WBL) over CSX RAILWAY (ABANDONED)

.14FR 621 & .23 TO T1503 · County 117, Virginia · Built 1969 · 2 Lanes · 12,111 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000011901
Year Built
1969
Reconstructed
2004
Length
39.5 m (129.6 ft)
Max Span
12.6 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
12,111
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$192,000,000
Total Project Cost
$290,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.