NB 95 TO RTE 123 N over ROAD INTO PARKING LOT

00.05FR95N/00.20TO123-NB · County 153, Virginia · Built 1995 · 2 Lanes · 5,713 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000024483
Year Built
1995
Length
34.7 m (113.8 ft)
Max Span
34.1 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
5,713
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$40,000,000
Total Project Cost
$150,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.