I-95 SB over OCCOQUAN RIVER

00.40FR123/00.85TO1 · County 153, Virginia · Built 1962 · 4 Lanes · 77,464 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000014264
Year Built
1962
Reconstructed
1995
Length
263.9 m (865.8 ft)
Max Span
55.2 m
Width
26.4 m (86.6 ft)
Lanes
4
Daily Traffic
77,464
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,000,000
Total Project Cost
$25,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.