SHREVE MILL ROAD over DULLES GREENWAY

00.80fr621/00.60to643 · County 107, Virginia · Built 1995 · 6 Lanes · 2,320 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000024435
Year Built
1995
Reconstructed
2007
Length
72.8 m (238.8 ft)
Max Span
36.9 m
Width
30.2 m (99.1 ft)
Lanes
6
Daily Traffic
2,320
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$45,000,000
Total Project Cost
$150,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.