EB DULLES GREENWAY over TRIB. OF SYCOLIN CREEK

02.30FR7-15/00.55TO653 · County 107, Virginia · Built 1994 · 3 Lanes · 13,153 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000024424
Year Built
1994
Length
47.2 m (154.9 ft)
Max Span
22.6 m
Width
19.8 m (65 ft)
Lanes
3
Daily Traffic
13,153
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$10,000,000
Total Project Cost
$25,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.