I-95 RAMP C over RAMP A

00.50FR611/01.50TO242 · County 059, Virginia · Built 1995 · 3 Lanes · 20,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000024422
Year Built
1995
Length
21.6 m (70.9 ft)
Max Span
21.6 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
20,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$100,000,000
Total Project Cost
$250,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.