RAMP B_OF 95 over ROUTE 95 S.B.

1.65FR242/0.92TO123 · County 059, Virginia · Built 1994 · 1 Lanes · 8,202 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000023640
Year Built
1994
Length
79.2 m (259.8 ft)
Max Span
37.2 m
Width
9.7 m (31.8 ft)
Lanes
1
Daily Traffic
8,202
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$100,000,000
Total Project Cost
$220,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.