I-95 RAMP H-N over I-95 NBL

00.65FR286/02.00TO644 · County 059, Virginia · Built 1993 · 1 Lanes · 32,423 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000023621
Year Built
1993
Length
149.7 m (491.1 ft)
Max Span
39 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
32,423
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$2,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.