I-95 (RAMP H) over ALBAN-BACKLICK & RAMP GG

00.20FR95/00.06TO7100 · County 059, Virginia · Built 1993 · 2 Lanes · 2,716 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000023612
Year Built
1993
Length
77.1 m (253 ft)
Max Span
42.7 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,716
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000,000
Total Project Cost
$100,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.