FRONT STREET over CLINCH RIVER

1.40 WCL RICH;0.19 RTE460 · County 185, Virginia · Built 1950 · 2 Lanes · 2,310 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000000022467
Year Built
1950
Reconstructed
1959
Length
56.4 m (185 ft)
Max Span
28.3 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
2,310
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$353,000,000
Total Project Cost
$491,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.