ALLEGHENY ST. over BIG CREEK

0.20 4TH ST; 0.01 3RD ST · County 185, Virginia · Built 1932 · 2 Lanes · 87 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000022461
Year Built
1932
Reconstructed
2021
Length
13.1 m (43 ft)
Max Span
13.1 m
Width
5.9 m (19.4 ft)
Lanes
2
Daily Traffic
87
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$84,000,000
Total Project Cost
$141,700,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.