SBL I-95 over RTES 301 & EB 460

.40 Fr I85NB&2.34 To 460 · County 149, Virginia · Built 1962 · 4 Lanes · 26,567 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000021137
Year Built
1962
Reconstructed
1981
Length
49.6 m (162.7 ft)
Max Span
24.4 m
Width
22.4 m (73.5 ft)
Lanes
4
Daily Traffic
26,567
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$90,000,000
Total Project Cost
$110,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.