RTE 1-95 & RAMP H over RTE I-85 NBL & RAMP D
.39 Fr 301 & .35 To NBL85 · County 149, Virginia · Built 1978 · 6 Lanes · 58,993 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
37.219947, -77.391478
This bridge is in worse condition than 62.1% of bridges in County 149. The average bridge in Virginia is 0 years old; this one is 48 years old.
Nearby Bridges
INTERSTATE-95 NBL over EB RT 460 BUS (36) WYTHE
Built 1958
RTE. I-95 RAMP-H over INTERSTATE-85 SBL
Built 1978
I-95 RAMP-J over EB RT 460 BUS (36) WYTHE
Built 1978
INTERSTATE-95 SBL over EB RT 460 BUS (36) WYTHE
Built 1958
GRAHAM ROAD over LIEUTENANT RUN
Built 1978
INTERSTATE-85 SBL over GRAHAM ROAD
Built 1958
INTERSTATE-85 NBL over GRAHAM ROAD
Built 1958
SBL ROUTE 0095 over EBL RTE 460
Built 1962
ST. ANDREW STREET over LIEUTENANT RUN
Built 2022
INTERSTATE-95 SBL over MINGEA STREET
Built 1978
Bridge Details
- Structure #
- 000000000021157
- Year Built
- 1978
- Length
- 59.1 m (193.9 ft)
- Max Span
- 30.5 m
- Width
- 36.9 m (121.1 ft)
- Lanes
- 6
- Daily Traffic
- 58,993
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $582,000,000
- Total Project Cost
- $950,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.