I-64 WBL over Lee Hall Reservoir

0.80 Fr Route 105 · County 199, Virginia · Built 1965 · 3 Lanes · 46,528 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000020697
Year Built
1965
Reconstructed
2017
Length
30.2 m (99.1 ft)
Max Span
14.9 m
Width
20.1 m (65.9 ft)
Lanes
3
Daily Traffic
46,528
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.