EBL ROUTE 0060 over WBL RAMP RTE. 60

3.61 TO 173 /1.34 TO 238 · County 700, Virginia · Built 1984 · 2 Lanes · 5,741 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000020689
Year Built
1984
Length
49.1 m (161.1 ft)
Max Span
28.7 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
5,741
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.