I-81 SBL over NORFOLK SOUTHERN RWY

2.06 FR 292 - 2.42 TO 730 · County 171, Virginia · Built 1966 · 2 Lanes · 23,785 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000017016
Year Built
1966
Length
75 m (246.1 ft)
Max Span
24.9 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
23,785
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$220,000,000
Total Project Cost
$240,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.