MAIN ST-MT JACKSON over MILL CREEK

0.12 TO 263-0.00 SCL MT J · County 171, Virginia · Built 1934 · 2 Lanes · 5,158 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000016957
Year Built
1934
Reconstructed
1990
Length
34.4 m (112.9 ft)
Max Span
11.4 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
5,158
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$110,000,000
Total Project Cost
$122,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.