EBL POCAHONTAS TR over TOE INK SWAMP

0.03 TO 640 & 0.20 TO 106 · County 127, Virginia · Built 1947 · 2 Lanes · 5,728 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000000012641
Year Built
1947
Length
17.2 m (56.4 ft)
Max Span
16.2 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
5,728
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$880,000,000
Total Project Cost
$126,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.