WBL POCHONTAS TR over SCHIMINOE CREEK

1.34 FR 618 & .68 TO 615 · County 127, Virginia · Built 1947 · 2 Lanes · 3,719 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000012639
Year Built
1947
Length
13 m (42.7 ft)
Max Span
13 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
3,719
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.