SBL ROUTE 0095 over UPHAM BROOK

1.1 FR 1 / 1.29 TO 73 EBL · County 087, Virginia · Built 1962 · 3 Lanes · 49,529 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000009836
Year Built
1962
Reconstructed
2014
Length
35.2 m (115.5 ft)
Max Span
11.1 m
Width
17.5 m (57.4 ft)
Lanes
3
Daily Traffic
49,529
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$75,000,000
Total Project Cost
$85,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.