NBL ROUTE 0295 over BEAVERDAM CREEK

0.1 FR 360 & 1.5 TO 627 · County 085, Virginia · Built 1979 · 4 Lanes · 51,241 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000009431
Year Built
1979
Length
56.4 m (185 ft)
Max Span
27.4 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
51,241
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$400,000,000
Total Project Cost
$430,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.