ROUTE 0295(SBL) over BEAVERDAM CREEK

0.1 fr 360 & 1.5 to 627 · County 085, Virginia · Built 1979 · 4 Lanes · 43,406 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000009430
Year Built
1979
Length
52.1 m (170.9 ft)
Max Span
25.2 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
43,406
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$132,000,000
Total Project Cost
$165,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.