GEORGETOWN PIKE over DIFFICULT RUN

00.38FR676/00.81TO738 · County 059, Virginia · Built 1978 · 2 Lanes · 18,345 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000006472
Year Built
1978
Length
49.4 m (162.1 ft)
Max Span
22.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
18,345
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000,000
Total Project Cost
$350,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.