CLAIBORNE ROAD over HATCHER RUN

1.14 Fr 613 & 0.21 To 632 · County 053, Virginia · Built 1952 · 2 Lanes · 384 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000006063
Year Built
1952
Reconstructed
2021
Length
12.9 m (42.3 ft)
Max Span
11.9 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
384
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$166,000,000
Total Project Cost
$294,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.