I-85 SBL over CSX TRANSP. RIGHT OF WAY

3.40 FR 460 & 4.58 TO 703 · County 053, Virginia · Built 1968 · 2 Lanes · 14,878 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005970
Year Built
1968
Length
84.9 m (278.5 ft)
Max Span
30 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
14,878
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$362,400,000
Total Project Cost
$544,600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.