INTERSTATE-85 SBL over GRAVELLY RUN

5.88 FR 460 & 2.42 TO 703 · County 053, Virginia · Built 1968 · 2 Lanes · 14,878 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000005968
Year Built
1968
Length
43.8 m (143.7 ft)
Max Span
13.7 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
14,878
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$186,000,000
Total Project Cost
$280,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.