SBL ROUTE 150 over NS RAILWAY

.01 FR ECLRIC & .37 TO 76 · County 041, Virginia · Built 1972 · 2 Lanes · 32,706 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005141
Year Built
1972
Length
43.2 m (141.7 ft)
Max Span
15.7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
32,706
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$874,000,000
Total Project Cost
$105,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.