ROUTE 76 EBL over PROP CHINABERRY PKWY

.38 Fr 686 & .20To Rte150 · County 041, Virginia · Built 1988 · 2 Lanes · 20,858 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005028
Year Built
1988
Length
49.4 m (162.1 ft)
Max Span
24.1 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
20,858
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.