I-85 (NBL) over BRANCH of GREAT CREEK

1.93 FR 644R &.8 TO 46 · County 025, Virginia · Built 1968 · 2 Lanes · 11,968 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000000003613
Year Built
1968
Length
7.2 m (23.6 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
11,968
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$81,600,000
Total Project Cost
$132,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.