NBL BOYDTON PLANK over CSX TRANSP RIGHT OF WAY

.61 FR 758 & .33 TO 634 · County 025, Virginia · Built 1950 · 2 Lanes · 1,385 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000003562
Year Built
1950
Reconstructed
2023
Length
55.3 m (181.4 ft)
Max Span
18.5 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
1,385
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$920,000,000
Total Project Cost
$100,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.