BROWNS GAP TPK over BRANCH DOYLES RIVER

2.00 FR 668 / 0.33 TO 629 · County 003, Virginia · Built 1932 · 2 Lanes · 528 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000000867
Year Built
1932
Reconstructed
2016
Length
7.3 m (24 ft)
Max Span
6.1 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
528
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$120,000,000
Total Project Cost
$155,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.