BROWNS GAP TPK over CAMPBELLS CREEK

0.47 FR 672 / 0.34 TO 673 · County 003, Virginia · Built 1932 · 2 Lanes · 1,048 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000000865
Year Built
1932
Length
6.7 m (22 ft)
Max Span
6.7 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
1,048
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$120,000,000
Total Project Cost
$155,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.