BROWNS GAP TURNPIK over BLUFF CREEK

0.22 FR 674E/0.02 TO 674W · County 003, Virginia · Built 1948 · 2 Lanes · 1,725 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000000863
Year Built
1948
Length
8.4 m (27.6 ft)
Max Span
8.4 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
1,725
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.