QUARRY ROAD over QUARRY ROAD OVER I91
2.0 MI S I91-I89 INTERCHG · County 027, Vermont · Built 2008 · 2 Lanes · 800 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.612225, -72.345183
This bridge is in worse condition than 6.8% of bridges in County 027. The average bridge in Vermont is 0 years old; this one is 18 years old.
Nearby Bridges
US 00005 ML over OTTAUQUECHEE RIVER
Built 1988
NH 12A over BLOOD BROOK
Built 1954
I 00091 ML over OTTAUQUECHEE RIVER
Built 1966
I 00091 ML over OTTAUQUECHEE RIVER
Built 1966
C3015 over OTTAUQUECHEE RIVER
Built 1919
C3015 over OTTAUQUECHEE RIVER
Built 2001
I 00091 ML over I 91 OVER US 5
Built 1966
I 00091 ML over I 91 OVER US 5
Built 1966
TRUES BROOK ROAD over BLOODS BROOK
Built 2008
I-89 SB over CONNECTICUT RIVER NECRR
Built 1966
Bridge Details
- Structure #
- 201408040A14082
- Year Built
- 2008
- Length
- 51.2 m (168 ft)
- Max Span
- 50 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 800
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Private (other than railroad)
- Last Inspected
- N/A
- Est. Improvement
- $1,823,000
- Total Project Cost
- $1,873,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.