TR 00TH9 over TH NO 9 OVER I 89
2.0 MI N EXIT 16 · County 007, Vermont · Built 1964 · 2 Lanes · 8,200 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
44.530419, -73.195292
This bridge is in worse condition than 82.1% of bridges in County 007. The average bridge in Vermont is 0 years old; this one is 62 years old.
Nearby Bridges
I 00089 ML over I 89 OVER TH NO 1
Built 1964
I 00089 ML over I 89 OVER TH NO 1
Built 1964
I 00089 ML over I 89 OVER US 7
Built 1963
I 00089 ML over I 89 OVER US 7
Built 1963
C2001 over INDIAN BROOK
Built 1992
MILL POND RD TH27 over INDIAN BROOK
Built 2015
ETHAN ALLEN PRKWAY over E A PKY OVER VT 127
Built 1984
FAU TH11 over FAU TH11 OVER VT127
Built 1984
I 00089 ML over I 89 OVER LAFOUNTAIN
Built 1962
I 00089 ML over I 89 OVER LAFOUNTAIN
Built 1962
Bridge Details
- Structure #
- 2004050D7504051
- Year Built
- 1964
- Length
- 79.6 m (261.2 ft)
- Max Span
- 26.5 m
- Width
- 8.9 m (29.2 ft)
- Lanes
- 2
- Daily Traffic
- 8,200
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,658,000
- Total Project Cost
- $2,708,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.