I 00089 ML over I 89 OVER US 7
I 89 EXIT 16 · County 007, Vermont · Built 1963 · 2 Lanes · 39,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
44.505525, -73.181175
This bridge is in worse condition than 49.5% of bridges in County 007. The average bridge in Vermont is 0 years old; this one is 63 years old.
Nearby Bridges
I 00089 ML over I 89 OVER US 7
Built 1963
I 00089 ML over I 89 OVER LAFOUNTAIN
Built 1962
I 00089 ML over I 89 OVER LAFOUNTAIN
Built 1962
I 00089 ML over I 89 OVER VT 15
Built 1962
I 00089 ML over I 89 OVER VT 15
Built 1962
US 00007 ML over US 7 OVER N.E.C. RR
Built 1952
C30WE over NEW ENGLAND CENTRAL RR
Built 1916
I 00089 ML over I 89 OVER NECRR
Built 1962
I 00089 ML over I 89 OVER NECRR
Built 1962
US 00007 ML over WINOOSKI RIVER
Built 1928
Bridge Details
- Structure #
- 200089074S04052
- Year Built
- 1963
- Length
- 46.3 m (151.9 ft)
- Max Span
- 23.5 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 39,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,862,000
- Total Project Cost
- $1,912,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.