I 00089 ML over I 89 OVER VT 15

I 89 EXIT 15 · County 007, Vermont · Built 1962 · 2 Lanes · 56,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
200089072S04182
Year Built
1962
Length
50.9 m (167 ft)
Max Span
28 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
56,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,046,000
Total Project Cost
$2,096,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.