VT 00012 ML over 3RD BR WHITE R. & NECRR
0.4 MI N JCT VT 107 E · County 027, Vermont · Built 2006 · 2 Lanes · 4,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.832617, -72.634539
This bridge is in worse condition than 6.8% of bridges in County 027. The average bridge in Vermont is 0 years old; this one is 20 years old.
Nearby Bridges
C2005 over 3RD BRANCH WHITE R.
Built 1900
VT 00107 ML over WHITE RIVER
Built 2013
VT 00012 ML over CAMP BROOK
Built 1928
C3024 over 3RD BRANCH WHITE R.
Built 1929
C3038 over CAMP BROOK
Built 1974
VT 00107 ML over LOCUST CREEK
Built 1959
TR 00TH6 over TH NO 6 OVER I 89
Built 1968
VT 00012 ML over LOCUST CREEK
Built 2012
I 00089 ML over I 89 OVER TH NO 32
Built 1968
C3079 over LOCUST CREEK
Built 1927
Bridge Details
- Structure #
- 200241003114042
- Year Built
- 2006
- Length
- 55.8 m (183.1 ft)
- Max Span
- 43 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 4,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,395,000
- Total Project Cost
- $2,446,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.