TR 02 FAS 165 over FURNACE BROOK

3.1 MI E JCT US 7 · County 021, Vermont · Built 1927 · 2 Lanes · 640 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
200165001011042
Year Built
1927
Reconstructed
1961
Length
8.8 m (28.9 ft)
Max Span
7.6 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
640
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$284,000
Total Project Cost
$334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.